mhstar.co.uk
Outsunny 3 Piece 6ft Folding Picnic Table and Bench Set, Portable HDPE with Carry Handles for Indoor/Outdoor Dining, Camping, BBQ, White
- Regular price
- £153.99 GBP
- Regular price
-
- Sale price
- £153.99 GBP
- Unit price
- per
Couldn't load pickup availability
Highlights
- Three-piece folding camping table set: Comes with a picnic table and two two-seater benches - sit with company during picnics, festivals and hiking trips.
- Foldable: Camping table and chairs quickly and easily fold in half, to unpack and pack with little hassle. Handles to carry easily.
- Metal frames: Powder coated for extra strength, keep supported as you sit and relax on this picnic table set. Safety locks to prevent accidental folding when using.
- Plastic tops: Tough and waterproof - a safe place to sit and dine from. Folding table and chairs set is easy to wipe clean.
- Dimensions: Table: 74H x 180W x 74D cm. Bench: 42H x 182L x 28W cm. Maximum load: Table: 50 kg. Bench: 240 kg. No assembly required.
Unfold and go for adventures outdoors, with this Outsunny three-piece picnic set. Comes with a folding table and two two-seater benches - simply undo and start sitting; the built-in handles make this set easy to carry around. The powder coated metal frames are strong and supportive, with joint locks to safely secure in place.
Features:
- Three-piece set includes table and two two-seater benches. For picnics, festivals, camping trips and more
- Built-in handles to carry around easily
- Tough and waterproof plastic tops
- Powder coated metal frames for strong, supportive core
- Safety locks prevent accidental folding and increase stability
- Non-slip pads on legs gently protect the floor
- No assembly required
Specification:
- Colour: White, Light Grey
- Material: Metal, HDPE
- Table Dimension: 180W x 74D x 74H cm
- Chair Dimension: 182L x 28W x 42H cm
- Folding Dimension: 92L x 74W x 7H cm (table), 92L x 28W x 7.5H cm (chair)
- Tabletop Size: 180L x 74W cm
- Tabletop Height: 74 cm
- Seat Size: 182W x 28D x 42H cm
- Weight Capacity: 240 kg (chair), 50 kg (table)
- Item Label: A20-469V00WT
Package Includes:
- 1 x Table
- 2 x Chair
- 1 x Manual
Share

